Highlights
Cost-effectiveness
The open rack is more affordable and the shipping cost is lower. It occupies a small space and makes full use of the existing space.
Quick install
The component composition is simple, a single person can complete the assembly in about 10 minutes
Cable management
It is more free and convenient to manage cables. In addition, Safewell’s open racks are equipped with cable management rings.
Material | SPCC | |||
Color | RAL7035 or RAL9005 | |||
Maximum Static Load | up to 450KGS | |||
Finish | Electrostatic powder paint | |||
Packaging | disassembled | |||
Complicance | CE,RoHS Certified | |||
Standard | Comply with ANSI/EIA-ECA-310-E; DIN41491:PART1.IEC297-2; DIN41494:PART7; GB/T3047.2-92 standard;compatible with ETSI standard |
Fixed shelf
Vertical cable management